Sections
-
-
-
- Policy 1: Application Fees
- Policy 2: Application Fee Refund
- Policy 3: Eligibility Criteria
- Policy 4: Online Application Period
- Policy 5: On-Site Verification: Missing Documentation
- Policy 6: On-Site Verification: Additional Verification Costs
- Policy 7: Verification Methodology for Buildings
- Policy 8: Failed Certifications
- Policy 9: Appeals Process
- Policy 10: Payment Period and Late Payments
- Policy 11: Purchase Orders
- Policy 12: Certification Credentials
- Policy 13: Recertification
- Policy 14: Mandatory Quality Assessment of Platinum Level Verifications
- Policy 15: Building Management Change
- Policy 16: Portfolio stream buildings opting for a 4-year certification cycle
- BOMA BEST Policy 17: BOMA BEST non-endorsement
- Show Remaining Articles (2) Collapse Articles
-
-
- How long do I have to complete my verification if I’ve registered my building under BOMA BEST Sustainable 3.0?
- How long will I have access to my BOMA BEST 3.0 online portal account?
- I am registered through the portfolio stream, when am I required to submit my building for the 2023 annual verification sample?
- Are there any changes to BOMA BEST certification eligibility criteria?
- Have the BEST Practices changed?
- Is there a new platform?
- What are the basic differences between BOMA BEST Sustainable 3.0 and 4.0?
- Will my BOMA BEST 3.0 documents be available in the new BOMA BEST Hub?
-
- How long is the certification period for buildings registered in the Single Stream?
- Can I view the BOMA BEST Questionnaires before registering a building in the Hub?
- How long do I have to complete the questionnaire after registering my building?
- What is the purpose of the Baseline Practice questions?
- Is there overlap between BOMA BEST Sustainable and BOMA BEST Smart?
- What happens when I create a test building in the Hub?
-
- What credit can I apply for in GRESB with my BOMA BEST certification?
- How many GRESB points can I earn using the BOMA BEST Sustainable certification?
- How many GRESB points can I earn using the BOMA BEST Smart certification?
- What certification date should be used for my GRESB submission?
- Can I move to a 4-year certification cycle so I can achieve the maximum amount of points from GRESB?
- What are the fees for the 4-year certification cycle?
- How can I request a 4-year BOMA BEST certification cycle for my Portfolio?
-
-
- Coming soon
How-To Manual
Section
Fees and Payment
TITLE
Add or Update a Purchase Order Number in the Hub
A Purchase Order Number (PO#) can be added by a user directly on the Hub so that it is reflected on the building’s invoice.
- Log into your account and click on the Buildings tab under the Properties drop-down
2. Click on the building you wish to add or update a PO#
3. Once on the buildings’ profile page, click on the Invoice tab at the top of the page
4. Once you are on the Invoice tab, click on the Refresh This will ensure that the most up to date information is being displayed.
5. Scroll horizontally in the invoice section until you see the Purchase Order field, you can type in the PO# into this field and then click the Update button beside the field.
6. The PO# will now be reflected in your invoice. To download the updated invoice with the PO#, click on the Update button under ‘Update Invoice’
7. Once updated, you can scroll over to the right and click on the Download button