HOW-TO MANUAL
Contents
-
Sections
-
-
-
- Policy 1: Application Fees
- Policy 2: Application Fee Refund
- Policy 3: Eligibility Criteria
- Policy 4: Online Application Period
- Policy 5: On-Site Verification: Missing Documentation
- Policy 6: On-Site Verification: Additional Verification Costs
- Policy 7: Verification Methodology for Buildings
- Policy 8: Failed Certifications
- Policy 9: Appeals Process
- Policy 10: Payment Period and Late Payments
- Policy 11: Purchase Orders
- Policy 12: Certification Credentials
- Policy 13: Recertification
- Policy 14: Mandatory Quality Assessment of Platinum Level Verifications
- Policy 15: Building Management Change
- Policy 16: Portfolio stream buildings opting for a 4-year certification cycle
- BOMA BEST Policy 17: BOMA BEST non-endorsement
- Show Remaining Articles2 Collapse Articles
-
-
- How long do I have to complete my verification if I’ve registered my building under BOMA BEST Sustainable 3.0?
- How long will I have access to my BOMA BEST 3.0 online portal account?
- I am registered through the portfolio stream, when am I required to submit my building for the 2023 annual verification sample?
- Are there any changes to BOMA BEST certification eligibility criteria?
- Have the BEST Practices changed?
- Is there a new platform?
- What are the basic differences between BOMA BEST Sustainable 3.0 and 4.0?
- Will my BOMA BEST 3.0 documents be available in the new BOMA BEST Hub?
-
- How long is the certification period for buildings registered in the Single Stream?
- Can I view the BOMA BEST Questionnaires before registering a building in the Hub?
- How long do I have to complete the questionnaire after registering my building?
- What is the purpose of the Baseline Practice questions?
- Is there overlap between BOMA BEST Sustainable and BOMA BEST Smart?
- What happens when I create a test building in the Hub?
-
-
- Coming soon
How-To Manual
Section
BOMA BEST Policies
TITLE
To ensure the integrity of all BOMA BEST certifications, every building that has achieved a Platinum-level will be subject to a secondary verification by a BOMA BEST Verification Professional as part of the BOMA BEST quality assessment process.
BOMA will initiate this process as soon as the original BOMA BEST Verification Professional notifies BOMA of the score. BOMA will endeavour to complete this step within a reasonable timeframe and with minimal interruption to the building manager. This secondary verification will occur remotely. Applicants may be contacted for additional information.
The score and level identified by the BOMA BEST Verification Professional will be considered the final score and may differ from the originally identified score.
This mandatory quality assessment of Platinum-level certifications is applicable to buildings in the Single Stream and the Portfolio Stream.