SUSTAINABLE BUILDINGS
Asset Classes
-
Offices
-
-
- Not applicable
-
-
- Not applicable
-
-
- Not applicable
-
-
- Not applicable
-
-
- Not applicable
-
-
-
Enclosed Shopping Centres
-
-
-
-
-
- Not applicable
-
-
-
-
Open Air Retail
-
-
- Not applicable
-
- Not applicable
-
-
-
-
- Not applicable
-
-
- Not applicable
-
-
-
Light Industrial
-
-
- Not applicable
-
- Not applicable
-
-
-
-
- Not applicable
-
-
- Not applicable
-
-
-
Multi-Unit Residential Buildings
-
-
- Not applicable
-
-
- Not applicable
-
-
- Not applicable
-
-
- Not applicable
-
-
- Not applicable
-
-
-
Health Care Facilities
-
-
- Not applicable
-
-
- Not applicable
-
-
- Not applicable
-
-
- Not applicable
-
-
- Not applicable
-
-
-
Universal
-
-
-
-
-
- Not applicable
-
-
-
Focus Area
Topic
Question #
Question
Applicability
Answer
Select all that apply:
- Air leakage
- Resealing
- Window replacement
- Adding shading to sunny areas
- None of the above
Description
A building envelope includes exterior components, such as the roof, walls, foundation and windows. A high-performance envelope is the most effective opportunity for achieving decarbonization of a building through passive strategies.
Optimization of the envelope can significantly reduce heating and cooling Requirements in the building, thus reducing energy consumption and electrical demand as well as decreasing the size and costs of mechanical equipment.
Lower cost measures might include resealing, replacing broken windows, adding shading to sunny areas or similar strategies. At a minimum, air leakage should be addressed.
If budgeting and renewal cycles permit, it is ideal to undertake a deep green envelope upgrade before HVAC systems are retrofitted to optimize mechanical system design.
Requirements
-
- Identify the low-cost envelope improvement items from the assessment, condition or deep retrofit studies that have been implemented
- Document extent of implementation
Also see Other Notes
Documentation
- Describe measure(s) implemented, the benefit and potential savings impact
- Evidence of implementation through photos, as-built drawings or other proof
Adapted BB3 Question
Suggested Lead
References
Crosswalk
Other Notes
None
Scoring
1 or 2 Points, up to 4 Max Points