SUSTAINABLE BUILDINGS
Asset Classes
-
Offices
-
-
- Not applicable
-
-
- Not applicable
-
-
- Not applicable
-
-
- Not applicable
-
-
- Not applicable
-
-
-
Enclosed Shopping Centres
-
-
-
-
-
- Not applicable
-
-
-
-
Open Air Retail
-
-
- Not applicable
-
- Not applicable
-
-
-
-
- Not applicable
-
-
- Not applicable
-
-
-
Light Industrial
-
-
- Not applicable
-
- Not applicable
-
-
-
-
- Not applicable
-
-
- Not applicable
-
-
-
Multi-Unit Residential Buildings
-
-
- Not applicable
-
-
- Not applicable
-
-
- Not applicable
-
-
- Not applicable
-
-
- Not applicable
-
-
-
Health Care Facilities
-
-
- Not applicable
-
-
- Not applicable
-
-
- Not applicable
-
-
- Not applicable
-
-
- Not applicable
-
-
-
Universal
-
-
-
-
-
- Not applicable
-
-
-
Focus Area
Water
Topic
Tracking
Question #
W3.1b — Tracking Sub-Metered Use
Question
Was any sub-metered water use data tracked before and during Covid?
Applicability
Applicable to Enclosed Shopping Centre, Universal, Light Industrial, Open-Air Retail or Multi-Unit Residential buildings
Answer
Select one of the following:
- Yes – Complete BOMA BEST Form W1.0b
- No
- N/A – building built during or after the year 2022
Description
Sub-meters measure the water consumption of specific areas or equipment, providing property owners and managers with the ability to understand where and how building water is being used
Requirements
For any sub-metered water data available:
-
- Provide monthly sub-metered water data in table format – see Form W1.0b
- Provide water sub-meter details, such as make, model, location, photo and year of installation
- Indicate whether any water is collected and used on-site and whether that use has been sub-metered
Documentation
- Most sub-metered water use before Covid (2017 – 2019) and during Covid (2020 – 2022)
- Narrative of data collection methodology and sub-meter data, if available
Adapted BB3 Question
New in BOMA BEST 4.0
Suggested Lead
In-house
References
See Question W2.1
Crosswalk
TBD
Other Notes
Water consumption data derived from landlord-installed meters, read manually each month is acceptable.
Applicants do not need to provide data for all five previous years. Provide the following, at a minimum,
- data from one year before Covid, i.e. any time between 2017 and 2019
AND - data from one year during Covid, i.e. any time between 2020 and 2022
- data from one year before Covid, i.e. any time between 2017 and 2019
Scoring
3 Points