Focus Area
Indoor Air Quality and Hazards
Topic
Assessment
Question #
I1.1a – Owner or landlord IAQ Corrective Actions
Question
Have base building Indoor Air Quality (IAQ) corrective actions been addressed by the owner or landlord?
Applicability
All asset classes
Owner/landlord occupied building
Tenant occupied building – all systems managed by the owner/landlord
Answer & Scoring
- Yes = 5 points
- No = 0 points
- Not Applicable – No corrective actions have been identified OR Tenant occupied building: No systems managed by the owner/landlord = 0/0
Max of 5 points
Requirements
- Reference the IAQ Assessment Report (from Question I1.0a)
- If applicable, reference Occupant Service Request (from Question A4.1)
- If applicable, reference Occupant Satisfaction Survey (from Question A4.2)
Documentation
- Narrative with photos showing corrective actions taken
- Explain why any corrective actions were not addressed, with an implementation plan / schedule if actions were deferred due to cost constraints
Suggested Lead
In-house, with third-party support
Value
- Building off I1.0a – Owner or landlord manages whole-building IAQ, improve Indoor air quality (IAQ) at the building by implementing recommendations made during an IAQ assessment
Description
Indoor Air Quality (IAQ) is achieved through the selection of appropriate and achievable air quality goals, regular surveillance and testing to verify HVAC performance and hygiene, efficient and effective procedures for addressing occupant IAQ concerns, and adequate training for the building management team.
References
None
Adapted BB 3.0 Question