SUSTAINABLE BUILDINGS
Asset Classes
-
Offices
-
-
- Not applicable
-
-
- Not applicable
-
-
- Not applicable
-
-
- Not applicable
-
-
- Not applicable
-
-
-
Enclosed Shopping Centres
-
-
-
-
-
- Not applicable
-
-
-
-
Open Air Retail
-
-
- Not applicable
-
- Not applicable
-
-
-
-
- Not applicable
-
-
- Not applicable
-
-
-
Light Industrial
-
-
- Not applicable
-
- Not applicable
-
-
-
-
- Not applicable
-
-
- Not applicable
-
-
-
Multi-Unit Residential Buildings
-
-
- Not applicable
-
-
- Not applicable
-
-
- Not applicable
-
-
- Not applicable
-
-
- Not applicable
-
-
-
Health Care Facilities
-
-
- Not applicable
-
-
- Not applicable
-
-
- Not applicable
-
-
- Not applicable
-
-
- Not applicable
-
-
-
Universal
-
-
-
-
-
- Not applicable
-
-
-
Focus Area
Topic
Question #
Question
Applicability
Answer
Select all that apply:
- >50% of low-and no cost measures (scheduling, sensors, fans etc.) identified in the last energy assessment
- >50% of all the ECMs identified in the last or before-last energy assessments
- LED retrofit in common or back-of-house areas
- LED retrofit in tenant spaces / resident suites
- HVAC retrofit
- HVAC retrofit as part of tenant change-over
- None
Description
Energy conservation and carbon reduction recommendations identified in assessments are typically identified as no-/low-cost, medium-cost or capital projects. They can also be prioritized by urgency, financial metrics, complexity, environmental impact or other relevant criteria.
Low hanging fruit are generally considered operational efficiency improvements or small upgrades that are simple to implement and easily budgeted but often have lower energy reduction potential than capital measures.
Larger, more complex projects require planning and budgeting, are generally medium- or long-term projects and will significantly reduce energy consumption and carbon emissions. Major capital projects are likely required in order to achieve net-zero carbon.
No-/low-cost measures to improve operational efficiency are important to implement short-term to reduce as much energy and carbon as possible before larger projects are budgeted and scheduled.
Requirements
-
- Review and list energy conservation or carbon reduction measures identified in the past five years
- Document what was implemented
Documentation
- Evidence of energy conservation or carbon reduction measure implemented
Adapted BB3 Question
Suggested Lead
References
Crosswalk
Other Notes
Scoring
1 or 2 Points, up to 5 Max Points