SUSTAINABLE BUILDINGS
Asset Classes
-
Offices
-
-
- Not applicable
-
-
- Not applicable
-
-
- Not applicable
-
-
- Not applicable
-
-
- Not applicable
-
-
-
Enclosed Shopping Centres
-
-
-
-
-
- Not applicable
-
-
-
-
Open Air Retail
-
-
- Not applicable
-
- Not applicable
-
-
-
-
- Not applicable
-
-
- Not applicable
-
-
-
Light Industrial
-
-
- Not applicable
-
- Not applicable
-
-
-
-
- Not applicable
-
-
- Not applicable
-
-
-
Multi-Unit Residential Buildings
-
-
- Not applicable
-
-
- Not applicable
-
-
- Not applicable
-
-
- Not applicable
-
-
- Not applicable
-
-
-
Health Care Facilities
-
-
- Not applicable
-
-
- Not applicable
-
-
- Not applicable
-
-
- Not applicable
-
-
- Not applicable
-
-
-
Universal
-
-
-
-
-
- Not applicable
-
-
-
Focus Area
Indoor Air Quality and Hazards
Topic
Renovations and Maintenance
Question #
I4.1 – IAQ Control in Construction Specifications
Question
Are the construction IAQ controls included in specifications for owner or landlord renovation or construction projects?
Applicability
Applicable to all buildings (systems or equipment in the owner or landlord’s control)
Answer
Select all that apply:
- Yes — included in specifications
- Yes — evidence of implementation exists
- No
Description
Specific guidelines must be in place for base-building or tenant renovations and construction projects to ensure that contaminants are not released into the surrounding interior environment and building indoor air quality (IAQ) is maintained.
Contractors or sub-contractors performing renovation or construction work in a building may be required to follow SMACNA IAQ guidelines as directed by the owner or landlord.
Requirements
Before construction:
- Incorporate the Construction IAQ Control Plan into design and construction specifications for all owner or landlord-led renovation or construction projects being planned in the building
- Identify construction projects where the implementation of the Construction IAQ Control Plan would apply
- Prepare the specifications for those projects and highlight the sections detailing the construction IAQ control measures to follow
During and after construction:
- Conduct regular inspections and document where and how the construction IAQ control measures are followed
- Keep a record of the inspections and track implementation of controls for the duration of the construction project
Documentation
- Section of construction specifications detailing IAQ control measures
- Photos, air monitoring or inspection reports demonstrating implementation of the Construction IAQ Plan
Adapted BB3 Question
New in BOMA BEST 4.0
Suggested Lead
In-house, with third-party support
References
Crosswalk
TBD
Other Notes
None
Scoring
1 or 3 Points